Plastering works (improved plaster). SNP for plastering work and maximum tolerances Certificate of acceptance of plastering work


Many people, before starting repairs, think whether they need to carry out plastering work, this is due to only one fact - ignorance of execution technologies repair work and the consequences of not complying with them. - this is the process of leveling any surfaces vertically and horizontally using special dry mixtures (gypsum, cement-lime plasters). The main task of applying plaster is to obtain the correct geometry of the premises: setting angles of 90 degrees, leveling the width doorways and slopes, making the walls parallel, obtaining a single and even plane.

Based on the quality of execution, plaster is divided into three categories: simple, improved, high-quality.

Document regulating the quality and technology of these works -

All these requirements apply both to manual application of plaster and to machine application.

Tolerances for plastering work
Parameters and properties of plasterSimpleImprovedHigh quality
Deviations from the vertical by 1 m, no more3mm2mm1mm
Maximum deviation from vertical by
the entire height of the room
15mm10mm5mm
Number of unevenness per 4m2, no more3 2 2
Depth of irregularities, no more5mm3mm2mm
Deviation from horizontal by 1 m, no more3mm2mm1mm
Base moisture content, no more8% 8% 8%

Thickness of the plaster layer (plaster)

When following the technology of plastering work, it is worth paying special attention to the thickness of the plaster, both the minimum and the maximum permissible!

These values ​​depend on the plaster mixture and are different for each. For example, for gypsum plaster machine applying Knauf MP-75, the thickness of the plaster layer should be in the range: from 8 mm to 50 mm (for one sweep). If it is necessary to apply plaster with a thickness of more than 50 mm, then this should be done 2 times with drying and re-priming the first layer. Look this information in the descriptions plaster mixtures and better on the manufacturers' websites!

Permissible thickness of the plaster layer

Based on these parameters and the curvature of your walls, you should select the appropriate mixture.

This is very important parameter, on which the quality and durability of the plaster depends! If this requirement is not met, cracks may appear on the surface and even detachment from the base.

Key excerpts from SNiP for plastering work

3.15. When plastering brick walls at temperatures environment 23 °C and above, the surface must be moistened before applying the solution.

3.16. Improved and high-quality plaster should be performed along beacons, the thickness of which should be equal to the thickness of the plaster coating without a covering layer.

3.17. When installing single-layer coatings, their surface should be leveled immediately after applying the solution; in the case of using trowels, after it has set.

3.18. When installing a multi-layer plaster coating, each layer must be applied after the previous one has set (the covering layer - after the mortar has set). Leveling the soil should be done before the mortar begins to set.

3.19. Sheets of gypsum plaster must be glued to the surface brick walls compositions corresponding to the design ones, placed in the form of marks, 80x80 mm in size on an area of ​​at least 10% along the ceiling, floor, corners of the vertical plane every 120–150 mm, in the spaces between them at a distance of no more than 400 mm, along the vertical edges - in a continuous strip . Sheets to wooden bases should be secured with wide-headed nails.

3.20. Installation of gypsum moldings should be done after the base of gypsum has set and dried. plaster solutions. Architectural details on the facade must be secured to the reinforcement embedded in the wall structure, which is previously protected from corrosion.

We also suggest that you familiarize yourself with (installation of mesh, mixture consumption, removal of beacons, special primers, plastering on beacons, etc.).

These works are used for various building materials: monolith, brick, foam concrete using special primers for each type of material. Before applying plaster on metal and wooden surfaces it is necessary to make special preparation (fill a metallized plaster mesh, prime the surface with a special primer), we do not recommend performing plastering work on such surfaces, it is better to resort to using the dry leveling method - installing gypsum board sheets. You cannot plaster over the plasterboard sheets themselves, since gypsum board sheets can become deformed under the influence of moisture; if your plasterboard partitions are assembled crookedly, it is better to redo them than to level them with plaster.

None of the current SNiPs contain regulations for the installation of plaster mesh, so this process is purely advisory in nature.

We recommend using plaster mesh with a plaster layer thickness of 50 mm or more, as well as on walls made of foam concrete, since there is a high possibility of cracks appearing there.

The acceptance certificate for completed work is drawn up after the contractor has fulfilled its obligations. The act is not an independent document, but serves as an annex to the work under the contract. It is part of the procedure for accepting the results of work and serves as the basis for final settlements under the contract agreement between the customer and the contractor.

FILES

Rules for drawing up an acceptance certificate for completed work

This document does not have a standard, legally approved, uniform template, so it can be drawn up in free form or according to a template developed at the enterprise. The act is printed on a regular A4 sheet in two copies - one for each side. After all work is completed and cooperation on the project is completed, the act is transferred to the accounting department of the customer enterprise for drawing up on its basis financial statements, including accounting for expenses incurred and reducing income tax.

When drawing up the act, you should adhere to the rules and regulations of office work developed for this type of document. In particular, the standard act must necessarily contain

  • information about both parties to the contract,
  • brief information about the contract itself under which the work was carried out,
  • Name of works,
  • date of work,
  • quality and cost of work performed.

The act must be signed by the heads of both organizations and stamped with seals (since 2016, the presence of seals and stamps for legal entities is not a legal requirement, so the absence of a stamp is not a strict necessity)

In the case of a large volume or special complexity of the work performed, a specially created commission, which includes representatives of the contractor and the customer company, may be involved to assess their quality, as well as draw up a report.

If absolutely necessary, a third party may be involved in the form of experts or representatives of regulatory government agencies. Their work must be recorded in a document, and each expert must also sign the document.

Why is this act needed?

The work acceptance certificate is a kind of guarantee against the occurrence of legal disputes and disagreements. If such proceedings nevertheless arise, the act becomes an evidentiary document. The court may regard the absence of an act as a disregard for the legally established procedure for the delivery and acceptance of work, which in turn may lead to the imposition of penalties by regulatory agencies.

A table is drawn up from the list of completed works. The document also states that the work was completed properly and the customer has no complaints against the contractor.

In cases where the customer is dissatisfied with the quality of the work performed, this should also be reflected in the report with a detailed listing of the identified deficiencies, as well as an indication of the time frame for their elimination.

Instructions for drawing up the acceptance certificate for completed work

After signing the acceptance certificate for the work performed, all claims can only be considered in court.

This instruction discusses registration in accordance with the requirements of Rostekhnadzor Order No. 470 dated November 9, 2017. This order was registered with the Ministry of Justice of the Russian Federation on February 15, 2018, and 10 days later updated requirements for the composition and procedure executive documentation came into force. From February 26, 2018, the act of activating the inspection of hidden work using old forms is illegal.
New form acts of inspection of hidden work developed in accordance with changes to the Town Planning Code Russian Federation, which entered into force on July 1, 2017.
So, first let's find out why it is needed? Certificate of inspection of hidden work is a document that is drawn up to record quality control and compliance project documentation those works that will subsequently not be visible to the human eye and presenting them for inspection without opening and dismantling the overlying structures will not be possible. For example, when finishing premises, first plastering is done, then puttying, and then painting the walls. So, before filling, a plastering report is drawn up, and before painting, a report is drawn up for filling the walls. Thus, we document the existence of the work performed, as well as its quality. Thanks to such acts, it is easy to ensure and then confirm construction control of the entire construction process chain.
In accordance with RD-11-02-2006, the list of hidden works that are subject to inspection is determined by the design organization. But in fact, not all projects have such a list, and if it is there, it is in a very truncated form, which often does not suit either the customer or the supervisory authorities. Based on this, it is recommended to draw up reports for all work, control over the implementation of which cannot be carried out after subsequent work has been completed.
Form

Form hidden work inspection report installed Federal service on environmental, technological and nuclear supervision and is presented in RD-11-02-2006 (Appendix No. 3). Changing the form of the act or deviating from it is not allowed. The act is printed on one sheet on both sides. If the information specified in the act does not fit on one sheet, then additional sheets are printed. But in this case, each page of the act is numbered. This is due to the possible substitution of pages that do not have signatures.
Now let’s take a closer look at the form of the inspection report for hidden work and the methodology for filling it out. The first thing you need to fill in is the name of the object capital construction. We take information about the name from the project documentation (the name of the object is indicated on title page or in drawing stamps). It is important that after the name of the object, enter information about its postal or building address.
Next, we proceed to filling out the section that is devoted to information about the persons who participate in the examination of hidden work. First, let's look at the functions of these individuals.
Developer (technical customer, operating organization or regional operator)– physical or entity, which implements investment project. Simply put, the customer (project investor, owner land plot, structures, structures, premises, operating organization) or a representative of the customer who is entrusted with a leading role in managing the construction process and effective interaction with other construction participants. It is important to know that in accordance with the law, from July 1, 2017, only those organizations that are members of the SRO can act as technical customers.
Person carrying out construction– as a rule, this person is the general contractor.
Person preparing project documentation– a design organization that designs a capital construction project (reconstruction, repair), and also carries out design supervision of construction.
Certificate of inspection of hidden work 2018, unlike the old form, does not provide for entering data on the person carrying out the construction who performed the work.
You can find out more about the system of relationships between participants in the construction process.
After we have clarified the role of each participant in the construction process, we have to indicate the following information about them: name, OGRN/ORGNIP, TIN, location of the organization, telephone/fax, as well as name, OGRN, TIN of the self-regulatory organization of which the customer is a member , general contractors or designer.
The developer (technical customer) must provide you with all this data. As a last resort, when the developer for some reason refuses to receive this information, you can go to the website of the Federal Tax Service and find out there most information necessary to fill out the inspection report for hidden work.
Next, we date the act and assign a number to it. It is better to number acts taking into account the name of the section of the project documentation on which the work was performed. For example, the numbering of the act for work on the device internal water supply and sewerage will look like this: 1/ВК, where 1 is the serial number of the act for the section, and ВК is the name of the section of the project documentation. This numbering will make your search much easier in the future. the required act, and will also avoid confusion in numbering.
At the next stage of registration AOSR (concealed work inspection certificate) We fill in information about representatives of persons who participate in the examination of hidden work. This information includes the position, surname, initials, details of the document of representation (orders and instructions), as well as the name, OGRN, TIN and location of the organization represented by the specialist. In addition, information about developer representative And representative of the person carrying out construction on issues construction control needs to be supplemented with information about. Data about representative of the person preparing the project documentation We supplement with information about the name, OGRN, TIN of the self-regulatory organization, of which the design organization is a member. It is worth noting that information about the number and date of the order (instruction) on the appointment of a responsible person is entered as details of the administrative document confirming authority. Each representative has their own order, and, accordingly, their area of ​​responsibility is different. For example, designers issue an order on architectural supervision. The general contractor and the subcontractor by order appoint persons responsible for the execution of construction and installation works and the maintenance of as-built documentation. In addition, the general contractor and the developer (technical customer) are required to appoint persons responsible for maintaining construction control at the site. Order forms, as well as examples of how to fill them out, can be found here.
To point 1 hidden work inspection report enter the name of the work that is submitted for inspection, with an exact indication of the place where it was carried out (building axis, floor, room number (name), picket, mileage and other coordinates that allow you to accurately identify the place of work).
To point 2 We enter the code of the working (design) documentation and the sheet numbers in accordance with which the work was performed. Next, enter the name design organization, which prepared the section of the project documentation.
In point 3 We indicate the name of the materials (products, structures, equipment) that were used to perform the work subject to inspection. After each material we indicate in brackets the name of the document confirming its quality and safety (certificate of conformity, certificate of conformity fire safety, sanitary and epidemiological conclusion, quality certificate, quality passport, technical passport, etc.) and the date of its issue. We indicate the name of the material in full. For example, if it is a pipe, then we indicate the material, diameter, and wall thickness of the pipe. If it is brick, then indicate its material (ceramic or silicate) and brand.
To point 4 We record data on as-built plans, laboratory tests, examinations and inspections carried out during the process of construction control.
In point 5 We indicate the actual dates of the work that we submit for inspection. Dates indicated in act of inspection of hidden work must coincide with the dates indicated in the general work log, the certificate of acceptance of completed work KS-2, the certificate of the cost of work performed and costs KS-3.
In point 6 We indicate the data (code) about the section of the project documentation for which the work was carried out, as well as the regulatory documents in accordance with which the work was carried out. Moreover, we write down the name of the document in full. For example, for reinforcement work that was carried out during the construction monolithic foundations, enter SP 70.13330.2012 “Load-bearing and enclosing structures”.
In point 7 We indicate the next type of work that, according to the technological chain, we have to perform. For example, in the inspection report for plastering work, the next type of work that is allowed to be performed is filling the walls or installing another finishing coating.
The number of copies is indicated as specified in the agreement, contract, terms of reference or other document in accordance with which the work is performed. If such information is not available in such documents, then the number of copies is established through oral negotiations with the customer.
In the attachments section we indicate all the documents that we attach to the acts. Such documents are as-built diagrams (drawings), conclusions and protocols of laboratory tests, examinations and survey reports. The list of applications must be numbered.
Please note that in accordance with RD-11-02-2006 as amended in 2018, if more than 5 documents are required to be specified in one of the paragraphs, then in such paragraph you can indicate a link to the register of such documents, and this register will be an integral part of the part of the act.
In the final part act on hidden work We indicate the same persons as on the first page. We write only the last name and initials. There is no need to enter other information about representatives in this part of the act.

Editor's Choice
Your Zodiac sign makes up only 50% of your personality. The remaining 50% cannot be known by reading general horoscopes. You need to create an individual...

Description of the white mulberry plant. Composition and calorie content of berries, beneficial properties and expected harm. Delicious recipes and uses...

Like most of his colleagues, Soviet children's writers and poets, Samuil Marshak did not immediately begin writing for children. He was born in 1887...

Breathing exercises using the Strelnikova method help cope with attacks of high blood pressure. Correct execution of exercises -...
About the university Bryansk State University named after academician I.G. Petrovsky is the largest university in the region, with more than 14...
Macroeconomic calendar
Representatives of the arachnid class are creatures that have lived next to humans for many centuries. But this time it turned out...